Book a Call
Lead Magnet · PDF

Mickey + VA Decision Guide

A short, plainspoken guide for owner-operators deciding between Mickey, a construction VA, or both. Written for the contractor who's looked at the website twice and wants the operator's-eye-view before booking a call.

Inside, you'll get a frame for thinking about what each piece does, when most contractors start with which, and what the first 90 days actually looks like — including the failure mode we see most often (skipping Capacity and trying to automate first).

What's in the guide

  • Mickey vs. a VA vs. both: what each is and how they fit together.
  • The four-phase methodology — Capacity → Transfer → Automate → Scale — and which phase you're probably in.
  • What the first 90 days actually looks like when you start with a VA, when you start with Mickey, and when you start with both.
  • The most common mistake we see contractors make — and how to avoid it.

Written by Chad Gill, owner-operator of Concreate since 2002 and founder of VAs for Construction.

Get the guide

Free PDF — sent to your inbox immediately. We'll use your email only for this download and the occasional update.

We'll only use your email for this download and the occasional update on construction AI we think you'd want. No spam.